| Performance Metric | Value (min) | Show on graphs |
|---|---|---|
| Storm duration | ||
| Time to initial impact | ||
| Time to peak impact | ||
| Time to initial recovery | ||
| Time to full recovery | ||
| Post-storm recovery time | ||
| Duration of impact to traffic | ||
| Normalized recovery time | ||
| Normalized traffic impact time |